Maxim-integrated 78M6610+LMU Evaluation Kit Bedienungsanleitung Seite 9

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 32
  • Inhaltsverzeichnis
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 8
78M6610+LMU Evaluation Kit User Manual
Rev 1 9
3.2 Single/Multiphase Measurements Using CTs
In this diagram, the on-board relays are also wired in series to demonstrate load control.
Connect
USB port
to PC
CT1
CT2
Line 1 Load
Line 2 Load
N
L1
N
L2
Line 1
Neutral
Line 2
+
+
AC source
Figure 2: 78M6610+LMU Evaluation Board Connections
1. Connect the AC source Neutral to J15 and the load(s).
2. Connect the AC source Line 1 to J2 and to J19 (Relay1) through the Line 1 CT.
3. Connect J20 (Relay1) to Line 1 load.
4. Connect Line 1 CT’s secondary to J14 (burden resistor).
5. Connect the AC source Line 2 to J4 and to J31 (Relay2) through the Line 2 CT.
6. Connect J30 (Relay1) to Line 1 load.
7. Connect Line 2 CT’s secondary to J10 (burden resistor).
Seitenansicht 8
1 2 3 4 5 6 7 8 9 10 11 12 13 14 ... 31 32

Kommentare zu diesen Handbüchern

Keine Kommentare